Sheffield Based- Since 2008.

Unless stated all items are OO Gauge (1:76)
(+44) 0114 3216 160.
(+44) 0114 2647 449.
         0 755 7126 651.
Email: support@oliviastrains.com
Skype Us
Mon - Fri- 09:00 - 17:00 / Sat- 09:00 - 16:00.
image-main
image-thumb
image-thumb
image-thumb
image-thumb

Hornby R3619 5013 Abergavenny Castle

Hornby R3619 4-6-0 Castle Class.
5013 Abergavenny Castle.
In BR Green Late Crest Livery.

10 In Stock Ready to Order!

Locomotive Prices:
£170 – Analogue. 
£198 – 8 Pin Decoder Fitted.
£245 – TTS Fitted

£311 – ESU V5 Olivia’s Sound Fitted.

Additional Work Available- DCC Fitted Only. (NOT TTS)
£20 – Firebox Flicker (if not fitted with oil lamps)
£45 – ESU Stay Alive Fitted
£ 7 – Train Crew Fitted (Driver & Fireman.)
£ 7 – Cab Light.
—–
£36 – Additional Fitting Services (this charge + your options of the below.)
£ 5 – Oil Lamps Each- Click Here For Different Lamp Codes.
£13 – Firebox Flicker (if fitted with oil lamps)
£30 – Seuthe Smoke Unit.

By the time Charles Collett took over from George Churchward as Chief Mechanical Officer of the Great Western Railway at Swindon in 1921, holiday traffic from London to Devon and Cornwall was demanding heavier trains and the GWR management were devoting proportionally more money and resources to West of England services, from Paddington, than to any other routes. Collett’s solution was to take the basic 4-6-0 layout of the existing Star Class, keeping the same frame layout and wheel spacing and adding a newly designed No.8 boiler which was both larger and lighter.The result was the GWR Class 4073, or ‘Castle’ Class, with which Collett could both supplement the Stars and replace them on the heaviest expresses.

The Castle’s tractive effort was 31,625lbs at 85% boiler pressure compared to the Star’s 27,800lbs, whilst the grate area was increased to 29.4 ft2 in the Castle, from the 27.07 ft2 in the Star. The bar-frame bogie was of standard Swindon design, the superheater was the No.3 type as used in the Star and the top-feed device for introducing water into the boiler through the steam was of the standard GWR pattern.The GWR publicity machine made much of the Castle’s roomy cab, with side windows and comfortable seats for the driver and fireman, with a canopy extending rearwards for shelter. The copper-capped chimney and polished brass safety-valve cover, along with a fully lined livery, was reinstated, a welcome change to the austere post-war look and on August 23, 1923, No.4073 Caerphilly Castle went on display at Paddington Station. The original tender attached to the class was the standard low-sided six ton, 3,500 gallon type, but despite the Castle’s average coal consumption being one of the lowest in the country it was changed for a 4,000 gallon design during 1926.

As the Castles became available, they were entrusted with many of the GWR’s high profile express services, including the Bristolian and the Cheltenham Flyer and they regularly registered high speed runs, 100mph being attained on several occasions. The advent of the ‘King’ Class locomotives in 1927 could have displaced the Castles from the main services but their restricted route availability because of their weight limited their rostering and the Castle class remained the most useful Great Western express passenger engines, operating right across the region. From August 1923 to August 1950, 155 Castle Class locomotives were built new at Swindon Works, in ten lots for the GWR and two lots for British Railways’ Western Region and a further sixteen were converted from other classes.

In 1932 there were improvements to the boiler and firebox area and further changes followed in 1946, when a higher degree of superheat was added to the Castle boiler. From 1956 the fitting of double chimneys to selected engines, combined with larger superheaters, further enhanced their capacity for sustained high-speed performance, but by December 1965, the last of the class were withdrawn from traffic.5013 Abergavenny Castle was built at Swindon in June 1932, entering traffic at Newton Abbot on June 27th. During the course of its lifespan, the locomotive served throughout the GWR region, from Penzance to Carmarthen, before finally being withdrawn from Llanelly in July 1962.

New P&P Cost UK & International From July 2020
For Full   Postage Options Click Here.

£6 Royal Mail upto 10kg (Recorded Delivery 2-5 days) from postal Date
£10 DHL Next Day Delivery upto 10kg (from pick up schedule)

International
£22 DHL upto 1kg insured to £300
£34 DHL Insured to £800
Over 1kg we will discuss the weight & insured value on a per order valuation.

Click Here To Order.
Tel: 0114 3216 160 Or 0114 2647 449.