Sheffield Based- Since 2008.

Unless stated all items are OO Gauge (1:76)
(+44) 0114 3216 160.
(+44) 0114 2647 449.
         0 755 7126 651.
Email: support@oliviastrains.com
Skype Us
Mon - Fri- 09:00 - 17:00 / Sat- 09:00 - 16:00.
image-main
image-thumb

Hornby R3861 Merchant Navy 35017 Belgian Marine

Hornby R3861. 8P Merchant Navy Class
35017 “Belgian Marine”
In BR Green Early Emblem  Livery.

ERA 4

Pre-order expected  Aug 2021!

Locomotive Prices:
£190 – Analogue.
£222  – 8 Pin Decoder Fitted. 
£326  – Olivia’s ESU V5 Sound Fitted. 

Additional Work Available- DCC Fitted Only.
£20 – Firebox Flicker (if not fitted with oil lamps)
£45 – ESU Stay Alive Fitted (ESU Decoder Req)
£ 7 – Train Crew Fitted (Driver & Fireman.)
£ 7 – Cab Light.
—–
£36 – Additional Fitting Services (this charge + your options from below.)
£ 5 – Electric Lamps Each- Click Here For Different Lamp Codes.
£13 – Firebox Flicker (if fitted with Electric lamps)
Seuthe Smoke Unit Cannot be Fitted due to Screw In Chimney.

Suitable rolling stock:
R4711
R4712
R4713.
R4972
R4972A
R4975.
R4976
R4977
R4979
R4981
R4982

Conceived in 1937 when Oliver Bulleid became Chief Mechanical Engineer of the Southern Railway, the Merchant Navy Class represented Bulleid’s vision for a quick accelerating, mixed traffic 4-6-2 locomotive, equally capable of hauling passenger services (such as the Golden Arrow and Atlantic Coast Expresses), or freight workings, to a speed of around 75mph. Mainly designed from the Brighton Works Drawing Office, under C.S Cocks, Bulleid, always aware of practical applications and costing implications, ensured that the best design practices of the time were applied to the new locomotive.

Like his mentor, Nigel Gresley, Bulleid was a technically arrogant CME, an advocate of locomotives being driven hard and to brisk schedules and this materialised in his design ideas.In 1934, Bulleid had been opposed the use of streamlining, but for the Merchant Navy’s ‘air-smoothed’ design it suited his purposes, being easy to clean mechanically and hiding the boiler’s external pipes, which in turn meant they could be run for function, rather than aesthetics. Opting for a welded steel firebox, instead of traditional copper construction for reduced weight and pressure benefits, Bulleid was able to make the three equally sized cylinders smaller, at 18”, and better balanced.

New X-ray inspection techniques were specifically developed to monitor wear to the welded areas, whilst the newly designed Bulleid Firth Brown 6’ 2” driving wheels reduced the amount of hammer blow to the rails, also resulting in less wear. Of all the new features Bulleid incorporated into the design, perhaps the most ingenious and, ultimately, most controversial, was his decision to totally enclose the valve motion in an oil bath, to prevent attritional wear through grit ingress. Despite the onset of war in 1939, Bulleid’s design was accepted by the wartime Railway’s Executive Committee and production commenced through November 1940 at Eastleigh Works, the first loco, 21C1 Channel Packet, being named on March 10, 1941.

The reaction to the new design was very much polarised into two camps: The footplate staff were dramatically in favour as, for the first time in the Southern’s history, they had been offered an engine that was more powerful than existing stock, as well as having an ample reserve of power to assuage the engineman’s constant fear of being left short of steam. On the other hand, maintenance staff cursed the design, multiple panels having to be removed to gain access to even the most minor of mechanical items, which led to an increase in maintenance time.Officially, the Merchant Navy class were constructed in three batches of ten: 21C1-21C10, 21C11-21C20 and 35021-35030.

In practice though, 21C2 incorporated lessons learnt from 21C1, which were then applied in turn to 21C3-10 and this lesson was repeated for the next two batches, resulting in a huge variation in the appearance of the locomotives.

Locomotive 35024 East Asiatic Company entered traffic on November 13, 1948 at Exmouth Junction and had its naming ceremony at Waterloo Station on May 5, 1949, where HRH Prince Axel of Denmark officially named the locomotive. East Asiatic Company remained at Exmouth until February 26, 1959, when it went in to works for its rebuild.

New P&P Cost UK & International From July 2020
For Full   Postage Options Click Here.

£6 Royal Mail upto 10kg (Recorded Delivery 2-5 days) from postal Date
£10 DHL Next Day Delivery upto 10kg (from pick up schedule)

International
£22 DHL upto 1kg insured to £300
£34 DHL Insured to £800
Over 1kg we will discuss the weight & insured value on a per order valuation.

Click Here To Order.
Tel: 0114 3216 160 Or 0114 2647 449.